The clock is longer than you think.
The factory date is not the day stock lands. Trucking, sea or air, customs and receiving all come after it. Count to the day you can sell.
This free calculator gives you safety stock and a reorder point for one SKU. Enter your average daily sales and total lead time in days. Then type in a buffer you already use, or let the tool work one out from your peak sales and slowest lead time. It shows each step, so you can check the math.
Calculate Safety StockAverage daily sales × average lead time
Your extra units for bad weeks
Lead-time demand + safety stock
The factory date is not the day stock lands. Trucking, sea or air, customs and receiving all come after it. Count to the day you can sell.
Weekly sales get multiplied by days, or cartons get added to single units. The math still looks fine. Pick one unit and one time unit first.
Someone copied an old number or a round percent. Write down where your buffer came from, and check it again when things change.
Safety stock is the extra stock you keep on top of normal sales to cover surprises while you wait for the next order: for an importer, a sales jump or a late shipment. The reorder point is your normal sales during the lead time plus safety stock; when stock on hand falls to it, reorder. Use a buffer you already have or a simple “peak minus average” method. Neither gives a service level, such as “in stock 95% of the time.” Check old sales data for stockout weeks, big promotions and shipping changes first.
Reorder point = daily demand × average lead time + safety stock
Match the units of demand and lead time: one SKU, one unit and one warehouse, with sales in units per day and every lead time in days. Note the dates your sales cover and how you handled stockouts, promotions and returns; a slow week during a stockout means you had nothing to sell, not low demand. If you plan in working days, use them everywhere. The calculator will not convert weeks, cartons or holidays.
| Field | What to write down |
|---|---|
| SKU and warehouse | One product, one unit, one place you receive it |
| Sales period | First and last date of the sales data |
| Sales unit | Units per day, plus any conversion you made |
| Lead-time unit | Days, on the same calendar |
| Odd weeks | Stockouts, returns, promotions you left out |
Use your average total lead time in days, counted to the day the stock is ready to sell; the peak method also needs your longest past total. The lead-time calculator adds production, local trucking, the main shipment, customs and receiving. Never type zero for a stage with no quote yet, and never use factory production time as the whole lead time.
lead time calculatorEnter the confirmed total below →The safety stock formula here has two options. If you already trust a buffer, type it in. The peak method takes highest daily sales × longest lead time, minus average daily sales × average lead time; each peak must be at least its average. It is a quick planning rule, not the odds of running out. Leave missing data blank, and never put your reorder point in the buffer box, which counts lead-time sales twice. Record why you chose the method.
| Buffer record | What goes in it |
|---|---|
| Quantity | Your set buffer, or the peak-method result |
| Basis | Your stock policy, or past peaks and averages |
| Conditions | SKU, sales period, warehouse and review date |
| Gaps | Missing history or orders you cannot compare |
Enter average daily sales and total lead time in days, then pick a buffer method. Boxes start empty; type zero only on purpose. The calculator shows safety stock, lead-time sales and the reorder point, with decimals and a rounded-up whole number. Sample buttons are teaching numbers, not forecasts.
When an input changes, recalculate one number at a time so you can see what moved the result. In the peak method a new peak also changes the buffer. Save old and new inputs with a date and reason. The table uses example R2, with a set buffer of 120 units, not a forecast.
| Change | Original | Revised | ROP before | ROP after |
|---|---|---|---|---|
| Daily demand only | 12 units/day | 15 units/day | 900 | 1,095 |
| Average lead time only | 65 days | 70 days | 900 | 960 |
| Established buffer only | 120 units | 150 units | 900 | 930 |
A safety stock level you can defend starts with a clear goal and real data, not a fixed percent. The “50% rule” is a rule of thumb; we do not recommend it. Very uneven sales, slow movers, stock split across warehouses or long stockouts need more than this simple tool. EOQ tells you how much to order; the reorder point tells you when. Check both against MOQ, cash and warehouse space.
| Weak spot | Data you need | Next step |
|---|---|---|
| Sales history shows true demand | Stockout dates and promo calendar | Remove lost sales and seasonal spikes |
| Past orders are comparable | Order dates and ready-to-sell dates | Check how lead times changed |
| One warehouse serves all sales | Stock, inbound and holds by location | Look at stock you can really use |
| Method matches your goal | Service goal and sales spread | Move to a full inventory model |
To make the safety stock calculation auditable, rebuild it in a spreadsheet with each input in its own column, plus highest sales and longest lead time for the peak method. Work out the buffer first, then the reorder point. Put the unit, source and date range next to each number, with a version date and checker. Lock the formula cells and mark a missing input “unknown”, never zero. This page does not save your history.
| Input | Value / unit | Source and dates | Method / formula | Checked by |
|---|---|---|---|---|
| Average daily demand | Units per day | Sales report and dates | How stockout days were handled | Name |
| Average and longest lead time | Days | Past orders, order to ready-to-sell | Same start, end and calendar | Name |
| Safety stock | Units | Stock policy or past peaks | Method you chose | Name |
| Reorder point | Units | Input version | Daily sales × average days + buffer | Name |
MOQ limits how much you can buy at once; shipping lead time tells you when to reorder. A reorder point does not remove the supplier’s minimum or tell you what you can afford. Before you order, check stock on hand, goods on the way, open customer orders, carton size and warehouse space. If the lead time changes, run the numbers again.

Importers’ safety stock often runs thin before the ship leaves, between the factory and the port. Track four dates there: factory ready, pickup, warehouse receipt and ready for the next leg, plan versus actual. At ASG we check these handoffs at our warehouses in Shenzhen and Dongguan. Put each past delay in the average, the peak or a list of one-off events, rather than adding fixed days. If the route changes, recalculate the total first.
| Event | Plan and actual | Why it moved |
|---|---|---|
| Factory ready | Release dates | Product or packing not ready |
| Pickup and trucking | Places and dates | Pickup or trucking delay |
| Warehouse receipt | Ready-to-use date | Receiving or paperwork issue |
| Next leg ready | Release dates | Waiting, rework or new instructions |

Pick one SKU, one warehouse and one sales period. Count sales per day and lead time in days. Note any conversions.
Use the total from order to ready-to-sell. For the peak method, add your longest past total too.
Type in your set buffer, or use the peak method. Write down why. A missing number is not zero.
Check safety stock, lead-time sales and the reorder point. Save the result, source data and date.
Safety stock with the peak method is (highest daily sales × longest lead time) − (average daily sales × average lead time). Use the same units and the same warehouse for every number. Each peak must be at least its average. This is a quick planning rule, not a service-level model. Note the dates your data covers.
There is no single good level. It depends on your goal, how uneven your sales are, how reliable your lead time is and what stock you can afford. Clean stockout weeks out of your data first. This tool shows the math for one method. A target like “in stock 95% of the time” needs a full model.
The 50% rule is a rule of thumb that sets safety stock as half of some base amount. It is not a full stock policy, and you must still say what the 50% is taken from and why it fits your SKU. We do not recommend a fixed percent; use real sales and lead-time data.
In Excel, put each input in its own column: average and peak daily sales, average and longest lead time, with units and sources. For the peak method, use =(MaxSales*MaxLead)-(AvgSales*AvgLead). Add that buffer to AvgSales*AvgLead to get the reorder point. Lock the formulas and mark missing inputs as unknown.
ROP is the reorder point: the stock level that tells you it is time to reorder. Here it equals sales during the lead time plus safety stock. EOQ, or economic order quantity, tells you how much to order based on cost. This calculator does not work out EOQ. Check any order size against MOQ, carton size, cash and warehouse space.
Reorder point = average daily sales × average total lead time in days + safety stock. The calculator shows the exact result and a rounded-up whole number. If sales are zero, the reorder point equals your safety stock, and a note tells you so. Before you act, check stock on hand and goods already on the way.
Check your safety stock inputs and keep the result with your buying plan. The calculator runs in your browser; nothing you type is uploaded. No calculator can promise you will never run out, so review the numbers at each reorder. To see how lead time, MOQ and stock fit together, start with the free first lesson.