The spec has no revision number.
You and the factory can end up working from two different files. Name the exact spec revision and sample ID on the PO, and keep the signed copy.
This free purchase order template is an Excel file for placing an order with a China supplier. Download it, fill in the yellow cells, and ask the supplier to sign the same version. It adds the spec, packing, inspection, timing and trade-term fields that a generic PO form leaves out.
You and the factory can end up working from two different files. Name the exact spec revision and sample ID on the PO, and keep the signed copy.
“Good quality” gives an inspector nothing to check. Write down what gets checked, against which standard, and what happens to goods that fail.
A date or a balance payment means little without the event that starts it. Say what starts production and what releases each payment.
A purchase order (PO) is the buyer’s written offer to buy set goods on set terms; the supplier signs to accept. This purchase order template lists the parties, PO number, date and currency, then each SKU with spec revision, quantity and unit price. Add the trade term with edition and named place, delivery date, payment steps, packing and mark rules, inspection basis and sample ID. Get the same revision signed before production. For a large or unusual order, have a lawyer read the final terms.
Fill the PO fields from records you have already agreed, not from memory. Each SKU should use the same unit and spec revision as the quote, in one currency. The file totals goods only; it does not add freight, duty, tax or exchange rates.
Write the trade term as rule, edition and named place; “FOB” alone does not say where the goods change hands. List each attachment by name and revision, so a later file cannot pass as the approved one. Leave an open term marked open, not filled with a guess.
| Field | What to write |
|---|---|
| Buyer and supplier | Full legal names, addresses and a contact for each side. |
| PO number and date | One fixed number, plus a revision for each change. |
| SKU and spec revision | The item, the approved spec and its file version. |
| Quantity, unit price, currency | One unit (pieces, sets) and one currency for every line. |
| Line and goods totals | Quantity × unit price, then the sum of the lines. |
| Trade term, edition, named place | For example FOB Incoterms 2020, named port. |
| Target timing | The milestone, what starts the clock, and calendar or working days. |
| Payment milestones | Deposit and balance triggers. Check bank details by phone. |
| Packing and shipping marks | The approved packing file, labels and carton marks. |
| Inspection and AQL | What is checked and the sampling plan you agreed. |
| Golden-sample ID | The approved sample you will compare against. |
| Goods that fail | Who can hold the goods, and how fixes get approved. |
| Sign-off | Who signs for each side, and which revision they signed. |
When buying from China, six clauses matter most: spec and sample, packing and marks, inspection, timing, payment, and goods that fail. Each should link a promise to the record you will check it against. For inspection, name the defect list and sampling plan; do not copy an AQL number you have not agreed. Tie each payment to proof, such as an inspection report. The template gives no bank details and no standard deposit.
Make the attachment list part of what the supplier signs, and treat any later change as a new revision. The wording below is a starting point for talks, not legal advice; have a trade lawyer review terms for a big order.
Example, not legal advice| Clause | Why it matters | Example wording |
|---|---|---|
| Spec and sample | One product reference, not two. | Example: Make the goods to spec [revision] and approved sample [ID], as signed with this PO. |
| Packing and marks | Ties packing to the right file. | Example: Pack and mark cartons per attached file [name / revision]. Send any change for approval first. |
| Inspection basis | Gives the inspector a clear scope. | Example: Inspect to the scope, defect list and AQL plan in attachment [revision]. Share the report before release. |
| Timing and changes | Keeps the clock in writing. | Example: Confirm [milestone] by [agreed date]. Tell [contact] in writing about any delay. |
| Payment milestones | Links each payment to proof. | Example: Pay each milestone only on the evidence listed in this signed PO. |
| Goods that fail | Sets the hold and fix process. | Example: Hold failed goods until both sides agree a fix and a release in writing. |
Excel works best for a purchase order template, because the lines and totals use formulas. Word suits longer written terms; Google Sheets suits a team editing one shared copy. You can import this Excel file into Google Sheets, then check the totals still add up. Whatever you use, keep one PO number and revision across every copy.
| Format | Best for | Version habit |
|---|---|---|
| Excel (this template) | Order lines, prices and formula totals | Save as PO number + revision; keep the formulas |
| Google Sheets | A team that edits one shared copy | Name the approved copy and control who can edit |
| Word | Longer written terms | Match the PO number and attachment list to the sheet |
Before you pay a deposit, check the supplier’s pro forma invoice (PI) against your signed PO line by line: quantities, unit prices, descriptions, currency and payment steps. A matching total can still hide a different product. Fix any gap in writing and keep both final versions together.
EXAMPLE-PO-001 is a filled purchase order with fictional parties and two USD lines: SKU A, 600 units at 3.00, and SKU B, 400 units at 5.50, for a goods total of 4,000.00. These are teaching numbers, not a real quote. Dates, trade term and payment steps stay as prompts for your own deal. The same record is on the workbook’s Example sheet.
| SKU | Spec | Quantity | Unit price | Line amount |
|---|---|---|---|---|
| EXAMPLE-SKU-A | SPEC-EXAMPLE-R1 | 600 | 3.00 | 1,800.00 |
| EXAMPLE-SKU-B | SPEC-EXAMPLE-R1 | 400 | 5.50 | 2,200.00 |
| Goods total | One currency; no freight or duty | 1,000 | — | 4,000.00 |
Your PO should name the spec file by revision and the approved sample by ID, so the factory, the inspector and you check against the same thing. A product name or an unnamed attachment is not enough. Before production, get the supplier to confirm both in writing. A tech pack sets out the spec in full.
tech pack templateA golden sample is the approved unit that mass production must match. Give it an ID, note the spec revision and approval date, and keep photos and sign-offs with it.
golden sample approval before mass production
Write the agreed MOQ and your order quantity on the PO, in the same unit and carton basis. A listing MOQ is not always final for every color or repeat order, so keep the supplier’s written confirmation. For timing, use daily sales, total lead time and a safety buffer to find your reorder point. It tells you when to order, not how much; check that against MOQ, carton size, budget and storage.
Check the supplier before you send a PO or pay anything: the legal company name, factory or trader, whether it can meet your spec, and who can sign the order. A neat PO does not prove a supplier or its bank details are genuine. If you want someone to manage sourcing and follow-up, read what a sourcing agent does first.

The PO problems we see most on China orders are missing spec revisions, vague packing rules and no agreed inspection basis. ASG runs QC in four stages: Supplier Audit, Production Monitor, Warehouse Check and Pre-Dispatch. Production Monitor looks for gaps against the spec; Pre-Dispatch checks labels and addresses. Both only work if the PO names the spec, sample, packing file and marks. Run these ten checks before you send yours.
ASG’s published QC workflow →Name the approved spec revision and the golden-sample ID. Settle open questions before a price or product name becomes the basis for production.
Compare descriptions, units, quantities, prices, currency, trade term and payment steps. Fix each gap in writing and keep the final versions together.
Complete the reference, lines, timing, packing, inspection and attachment list. Check the formula totals. Mark any term that is still open.
Put the PO number and revision in the subject. Attach the files, ask the supplier to sign that version, and give a reply date.
Save the signed PO with its attachments, the quote and the PI. Treat any later change as a new revision, never an overwrite.
A PO lists the parties, goods, quantities, prices, currency, timing, payment steps, trade term, inspection basis and packing rules. Write the trade term with its edition and named place, and name the approved spec and sample by ID. The supplier’s signature on the same revision makes it the agreed order.
Confirm the spec and sample, then check the quote and the PI against each other. Fill in the PO fields and check the totals. List each attachment by revision and leave open terms marked open. Send it, ask the supplier to sign that exact version, and file the signed copy with the quote and PI.
Put the PO number and revision in the subject line. Attach the PO and the spec files. Ask the supplier to sign that version and to flag any difference before production or payment. Give a clear reply date. Send it to a contact you have already verified, and file the reply with the order.
Yes. Excel and other office products offer generic purchase order layouts, but they rarely include spec revisions, sample IDs or inspection terms. This free ASG template is a separate Excel file built for China orders, with a blank PO sheet, a worked example and formula totals.
Put each line’s SKU, spec revision, quantity and unit price in separate cells. Multiply quantity by price for the line amount, then sum the lines in one currency. Show a missing input as “Incomplete”, not as zero. Add the order details, terms and attachment list around the lines. Check the formulas before you send it.
The free purchase order template is one Excel workbook with a blank PO sheet, a fictional Example sheet and formula-linked totals. Using it does not appoint ASG to buy for you. The full template pack comes with the course, The China Side Playbook, open to the waitlist first.
see what the founding course covers