In this lesson, I'm going to help you get one purchasing task clear. By the end, you'll have a one-page purchasing brief and a five-question checklist for quotes. Let's start with a scenario. Here's the setup: you're looking for a supplier for a foldable storage bag. You've asked around, and three quotes have come back. One is twelve yuan eighty per unit. Another is fourteen yuan fifty. The third is two US dollars and thirty-five cents. Which one would you look at first? Write down your first reaction. Is it the cheapest one, or the one with the smallest minimum order? For now, just note your choice. We're not judging it yet. All the quotes and numbers in this lesson are ones I've set up so we can practice the method. They aren't market prices, and they aren't real orders. From here on I'll just use them, without repeating that every time. Now let me open the quotes up for you. Factory One wants at least one thousand units, with a note saying "in stock." Factory Two accepts five hundred, with a note saying logo printing is available. Factory Three has a minimum of three hundred, and its quote names delivery terms at Ningbo port. The quantities already differ. So I'd ask three more things. Do the three quotes specify the same fabric and size? Is packaging included? Is the logo already in the unit price, or charged extra? A lot of that is still missing. Converting the currencies only changes the units. The missing conditions are still missing. Someone might say, "A domestic quote probably excludes freight." Someone else might feel that if logo printing is available, the printing cost must be included. Both of those are guesses. What I do is this: I don't fill in "included" on the factory's behalf, and I don't rush to decide it's charged extra either. I write "to verify" in that box, and then I send one specific question. For example, I'd ask: "Please itemize the individual packaging, logo printing and plate fee, and tell me which are already included in the unit price." That one sentence will do more to complete the quote than asking whether the price can come down. Let me be clear about what each of these two documents does. The brief spells out what you want to buy and what limits apply. The checklist shows whether the supplier has answered those points fully. Once you've done them, you can hand a vague request to a colleague, and they'll know how to ask for quotes and what still needs a follow-up. Which supplier to choose, and whether to pay, are still decisions for you and your manager. The cost, sample and order checks come after this, and we'll do them together. Here's the order for this lesson. First, I'll go through the five conditions that most often get mixed up in a quote. Then I'll walk you through the brief, line by line. After that, we'll check replies with the five questions. And finally, you'll do one on your own. Let's start with the five conditions that most easily get mixed together in a quote. The first is tax and invoicing. If you only ask "Is tax included?", nothing is really settled yet. I write down three things: who's buying, who's exporting, and what invoice or documents are needed. Then I ask the factory for a written quote based on that arrangement. The actual tax treatment goes to a qualified professional to check. When I fill in the brief, I mark the tax invoice and export arrangement as "to be confirmed" for now, and ask the factory to itemize what the quote includes. I'd suggest you don't add a tax rate to the unit price yourself and treat the result as the factory's offer. The second is the platform. You might see a yuan price on 1688, China's domestic wholesale site, and a US dollar price on Alibaba dot com. The same supplier can list different prices in the two places. I set aside the question of which one is the better deal. I put the specifications, quantity, tax invoice, packaging and delivery point into one table, then ask about each item. I treat a price a factory sends on WeChat the same way. I ask them to turn it into a written quotation that states the specifications, quantity, tax status and validity period, stamped with the company seal. Once I have the quotation, I do one check. I open China's National Enterprise Credit Information Publicity System and type in the company name from the quotation. Do the name and the unified social credit code match the business license? If they don't, stop and get it cleared up first. The platform name tells you where to look. What this particular quote covers depends on the written conditions for this order. The third is the minimum order quantity. In English we call it the MOQ, read as M, O, Q. Say the factory starts at one thousand units, and this time you only want to ask about five hundred. I'd follow up with three questions. Can you make five hundred? If so, does the extra go into the unit price, or is there a separate setup or plate fee? And on a later order, is that fee charged again? Let me set a number and work it through with you. Suppose the factory replies that five hundred is fine, at one more yuan per unit, plus a three-hundred-yuan plate fee. Five hundred units times one yuan is five hundred yuan. Add the plate fee, and this order costs eight hundred yuan more. Then I record three things separately: the unit price change, the one-off fee, and whether it's charged again later. A lower quantity doesn't always mean a lower total spend. Write it down, so nothing gets missed when you work out the total cost later. The supplier's written reply is what counts. The fourth is lead time. When a factory says "fifteen days," I park those words for a moment. I don't pass them on as a delivery promise. I ask two questions. When does the clock start? When the deposit arrives, or after the sample and the logo artwork are both approved? And when it ends, are the goods finished at the factory, or already delivered to the named forwarder's warehouse? In the brief, I keep just two slots: the start condition and the end point. For example: "Starts after logo artwork approval; ends when the factory has finished." The time to get the goods to the forwarder's warehouse is a separate question. The date you want the goods at an overseas warehouse goes on its own line, marked as a target whose feasibility is still to be confirmed. The fifth is packaging and the logo. The individual bag, color box, hang tag, barcode and carton marks: I list each one. I don't lump them into one line that says "packed as required." I give the barcode its own line. Which barcode system, who supplies the number and the barcode file, and which layer of packaging it's printed on all get written down. If the goods are going into a platform warehouse, I also ask who makes the inbound label and who puts it on. Say you want a clear bag with a one-color logo printed on it. I'd ask separately: Is the bag included? How much extra is the printing? Is there a plate fee charged only the first time? Do the sample and the bulk order follow the same requirements? For items confirmed as not applicable, I write zero. For anything still waiting for a reply, I write "to verify." Those two states mean completely different things when you do the math later. You can pick up the terms step by step. I'd suggest you keep three questions handy. How is the tax invoice arranged? Where is the price delivered to? What does packaging and the logo include? Every time a quote comes in, run through those three first. If a reply is vague, narrow your question down to one field, and send them one at a time. Now I'll set those three loose quotes aside and walk you through filling in a brief. It's the same practice storage bag project, and I'm giving you an information card. The current supplier delivered one thousand five hundred units last quarter. Five zipper complaints came in. The team wants a backup source, and it proposes a trial order of five hundred units. These three numbers mean different things. The one thousand five hundred units is a delivery record given in this exercise. The five hundred is a purchasing proposal. The five zipper complaints are leads to investigate. I'd first match each complaint to a specific order and batch, and check whether it's a product defect and which delivery it relates to. Until the scope of the numbers lines up, you can't get a reliable defect rate out of them. Open the blank brief, and let's write the first line together: what problem we're solving. Before I start writing, I like to find out where the need came from. There are three common sources: a restocking plan, a request from a colleague or customer, or a new project. Different sources mean different people to talk to. When I get a request, I talk to the person who raised it, face to face or on the phone, and ask what they really need. If you only look at a spreadsheet, you might get the quantity right and still buy the wrong thing. Then I answer three questions. First, what result do I need from this round? Second, what does the other person care about most? It might be lead time, it might be appearance, or it might be making sure the same complaints don't come back. Third, what standard tells us it's done? The standard has to be specific, checkable and dated. For example: before the agreed review date, get back several quotes with aligned conditions. That's much clearer than "find a few more good factories." For this exercise, I'd write: check the zipper feedback, assess one backup supply source, and decide whether a trial order is worthwhile. That line doesn't assume we have to switch suppliers. After checking, we might switch. Or the specification or the way the product is used might need adjusting first. Or we might simply not have enough information yet. Once the line is written, I run it through five checks: Is it specific? Can it be checked? Is it within reach? Do the numbers add up? Does it have a deadline? "Do the numbers add up" is the one people skip most. For example, if the budget only covers three hundred units but the target says five hundred, the line needs rewriting. I've put this five-item table in the template. At the end of this step, what you need to have is candidate information you can compare, and a recommended next step. Lots of conversations and a round of searching can't replace those concrete outputs. The second line is the product requirements. I put the existing sample, the photos, the size and the fabric requirements together, and give the attachment a number you can find again, like "storage bag sample photo, version one." I write the scope in two columns: what this inquiry includes, and what it excludes. Say this round is only for the clear-bag version. Then the color-box version goes in the exclude column. If a factory sends a bundled price you didn't ask for, you'll spot it right away. Any check standard that's still taking shape gets marked "to be confirmed." For example, "the zipper should run smoothly" isn't specific enough yet. In the next lesson, I'll help you turn it into a requirement you can observe and check. In this lesson, we just need one thing: your colleague knows which product version you mean, and which requirements still need asking about. Making up an open-and-close count or a pass standard just to make the brief look complete is a bad idea. The third line is quantity. The proposed trial order is five hundred units. If things go well, the team estimates that it may need one thousand five hundred units per quarter. I always mark that second number as an estimate. If you use it to promise the factory repeat orders, it won't hold up. The first number is also only a proposal for quoting and evaluation. It still has to be weighed against the MOQ, cash and what you're trying to test. If a supplier wants to quote on a different quantity, I keep the new condition and I keep the original quantity too. That way, when we compare later, it's clear whether a price change comes from the specification or from the quantity. Here's a real example. It's adapted from a project we did at ASG, with identifying details removed. A pet products brand came to us before launch to develop a set of products: harnesses, collars, leashes and a poop bag holder. The original brief was one line: two style lines, consistent but distinct. They also wanted to keep the first inventory under control and have the customization and fulfillment costs clearly laid out. We broke that line down into the brief: which product types each line had, which colors and sizes, the planned quantities, and how far the costs were worked out. Later the client gave us quantities. There was no purchase order yet, so we recorded them as planned quantities, marked "planned, not ordered." When you fill in the quantity line, split it the same way into three groups: what's decided, what's planned, and what hasn't been asked yet. The fourth line is the delivery point. In this example, I'd ask the factory for two prices: the ex-factory price, and the price delivered to the named Ningbo forwarder's warehouse. The forwarder's exact address is still to be added. "Ningbo" on its own doesn't define every cost. If a port or a trade term shows up in a quote, I also ask the supplier to spell out which tasks and costs it includes. The fifth line is the tax invoice and export arrangement. Until it's confirmed, I keep both quote conditions and decide once the responsible person has checked. Here I only go by written evidence. An abbreviation, or someone saying "it's always done this way," can't replace the conditions for your order. The sixth line breaks out packaging and labeling. The individual clear bag, the one-color logo, the barcode and the carton marks: write the requirement and the cost status for each. I keep what's charged per unit separate from what's charged once for the whole batch. The seventh line is timing. The team wants the goods at the US warehouse within six weeks. I mark that as an internal target first, and next to it I list the stages that need confirming: sample, logo artwork, bulk production, shipping and receiving. Then I schedule it backwards. Starting from the warehouse arrival date, I work back and write down how many days each stage takes and who gave that answer. Any stage that's still blank gets "to verify." If the stages add up to more than six weeks, the target needs another conversation with the manager. The factory has only answered the production time. The arrival time at the overseas warehouse still has to be confirmed separately. You need to connect the replies from different people before you can judge whether the target is realistic. The eighth line is budget and authority. To show how this line works, I'll set an authority: the manager has approved sample costs up to eighty US dollars, and the bulk order still needs separate approval. Once the limit is written down, I also ask: Does it include sample shipping? Is it a limit per occasion, or a cumulative one? Where is the approval recorded? Anything left vague stays "to verify." In your own project, if your manager hasn't given you an authority, write "to be confirmed." A good price doesn't turn permission to ask for quotes into permission to pay. Next to this line, I also list the people involved: who raised the request, who approves the money, who receives the goods, and who'll use them. I note how each person prefers to be contacted, too. Later, when something needs confirming, you'll know who to go to. The ninth line separates records, assumptions and unknowns. The past delivery of one thousand five hundred units can go under the records given in the exercise. "The zipper is the main cause of complaints" can only be an assumption for now, because the complaint batches, the exact problems and the overall complaint picture still need checking. The tenth line is the next step. If you only write "keep following up," no one can pick it up. I'd write: the operations lead matches the five pieces of feedback to orders and batches, and lists anything missing. The purchasing lead sends out one unified specification and collects quotes that answer all five questions. For each action, I add a review point. For example, before arranging a new sample check, look back at the results of the feedback investigation. That way, the next person who picks this up knows how far to go and when to come back and review. Once all ten lines are filled in, I go through it again from the top. Does every number say whether it's a record, a proposal, an estimate or a target? Does every "to verify" say who to ask? Once the brief is written, I send the same requirements to three to five suppliers for quotes. When the quotes come back, we check them item by item with the five questions. Question one: is the specification the same version? If a supplier says "made to the drawing," I first confirm which drawing they received, which version, and where they've used substitute materials. Question two: are the quantity and price tiers clear? A price for five hundred units and a price for one thousand need their conditions aligned before you can rank them. This checklist only finds inconsistencies and gaps. The factory's actual capability has to be checked separately. Question three: what's included? Tax invoice, packaging, logo, samples and plate fees. Look for a written reply on each one. Question four: where, and when, is it delivered? The location, the start condition and the end point should all be findable in your records. Question five: how long is the quote valid, how is payment made, and in what currency? Also ask how the payment stages relate to the inspection stages. My habit is this: next to every tick, I can point to at least one reply or one quote. A few days later, when a colleague asks, you can show the evidence, rather than just saying, "I remember he agreed." Let's look at a vague reply. The factory says, "Logo is possible, details to be discussed." I don't take that to mean the logo is already in the unit price. You can follow up like this: "Please confirm whether a one-color logo is included in this quote for five hundred units. If it's charged separately, please itemize the plate fee and the per-unit printing cost, and tell us which artwork version the bulk order will use." After asking, I keep it as "to verify" in the table and update it when the reply arrives. Sending the question only means you've followed up. The condition is settled once it's confirmed in writing. Once all five questions are answered, these quotes are much better suited to the next comparison. I keep the original quotes, the follow-up replies and the update times. One tidy, reworked table on its own isn't reliable. In the landed cost lesson later on, we'll add up the goods, packaging, freight and unsellable quantities together. Whatever is missing now, pass it on as a gap. Don't fill in a zero just so the calculator produces a result. I've also prepared a system map card. It shows which steps can go to an outside service, and which ones stay with you. In this lesson, we're collecting comparable inputs. The actual cost conclusion waits until the matching quotes and fees are ready, and we'll rework it in lesson nine. If you're overseas and you help local sellers work with Chinese suppliers, I especially want you to practice this part. The seller says "slightly better quality." The factory says "no problem." It's easy to translate both sentences straight across. But each side may have a different inspection standard in mind. What I do is write the requirement into the brief first, then send the open questions back. That step is where your value is: both sides know what they've each agreed to, and what's still hanging. Let's rewrite the next three replies together. The first reply: "The zipper is fine." You can ask: "When you say it's fine, which sample and which zipper specification are you basing that on? What check are we going to use? Can we both confirm the method and the sample number?" On that line of the brief, I first write: zipper specification and check method to be confirmed by both sides, with a space for the sample number. If the factory is willing to answer, that's good progress in the conversation. Whether the sample passes still depends on the check record. Turning "it's fine" into a guarantee that the whole batch passes is setting up trouble for later. The second reply: "Five hundred is OK, and we can print the logo." I'd keep asking: What's the unit price at five hundred? Is there a small-batch surcharge? Are the logo plate fee, printing and packaging charged separately? In the brief, record the proposed quantity, the per-unit cost and the one-off fees as separate items. Any box without an amount stays "to verify." That way, if the supplier later changes one of the conditions, you can point straight to what changed, instead of combing back through the whole chat. The third reply: "Ready in fifteen days." You can follow up: Does the clock start when the deposit arrives, or after the sample and the logo artwork are both approved? When the fifteen days end, are the goods finished at the factory, or already at the forwarder's warehouse? Until the factory confirms in writing, I put a proposed condition in the brief and mark it "to be confirmed." Once they reply, I add the evidence and the date. It looks like just one more line, but it heads off a very annoying misunderstanding: the factory meant "leaves the factory," and you told the seller "arrives at the overseas warehouse." There are two more things I want to be upfront about. A referral from someone you know can be a starting point for reaching a supplier, but it can't replace checking them afterwards. The person who referred them trusting them, and whether they can deliver to this order's requirements, are two separate questions. If you charge a service fee, charge per unit, or the factory pays you a commission, explain how you charge and what your service covers. If a fee is already built into the unit price, count it only once when you do the math later. We'll compare actual fees with an example in the cost lesson. When you recommend a supplier to a client, keep the requirements, the replies and any financial interest on record. That way, other people can see what your recommendation is based on. By now you've seen worked examples of quotes, the brief and follow-up questions. You can use the same method on the quotes you have in hand. I'd suggest three steps. Step one: remove the client's and the factory's identifying details. Step two: pick one original statement and one follow-up question of yours. Step three: find the line in the brief that needs updating, change it, and add the date. If the information isn't enough yet, keep the gap. The point of this method is knowing what to check next. When information is thin, it's fine not to choose yet. Now it's your turn to work on your own. Open this lesson's learner worksheet and look at round one. Leave the feedback page for after you're done. An Australian seller wants a quote for three hundred silicone ice trays with a logo, and hopes to get them to Sydney within eight weeks. The budget is undecided, and you'll need to think through the tax invoice and export arrangement yourself. This is a separate exercise. Write a one-page purchasing brief first. Focus on what's a recorded need, what's only a proposal, and what still has no answer. Leave the budget for the seller to set. Don't make one up for them. And just because the product is called a silicone ice tray, don't write that it already meets sales requirements. Its use and the requirements that apply need checking by the right professional. This time, I want you to come away with three things. First, whatever you can already write in the ten fields. Second, a list of things to verify, each saying who to ask and what to ask. Third, one specific follow-up question you'd send the supplier. Pause the video now and write those three things down. This is practice on paper only. You won't need customer names, real orders or payment details. When you're done, press play again. Let's review it together. Three hundred units is the seller's inquiry quantity. For now it can only be written as a quantity for quoting. Approval to order has to be confirmed separately. Eight weeks is the arrival target the seller proposed. Until production and shipping conditions are connected, it can only be written as the seller's target. That's a different thing from a lead time the supplier has confirmed. The budget is undecided, so write "to be confirmed." If you copied over the eighty-dollar sample authority from the storage bag example, that would be a mistake. These are two different projects, each with its own authority. If you kept the status and the source for all three, you've hit the main point this lesson is practicing. Now look at your follow-up question. If it just asks "Can you do it?" or "Can it be a bit cheaper?", it won't fill the gaps in your brief. I'd build the question around one gap. For example: "Please confirm whether three hundred units meets the minimum order for this product. If extra costs apply, please itemize the unit price and the one-off fees, and state the logo and packaging requirements they correspond to." That's one example. There are many possible answers. As long as your question maps to one gap, and the reply can update that field, it's doing real work. When the reply comes in, check whether it actually answers the question. Anything it doesn't answer stays "to verify." Finally, I'll add one new piece of information. Suppose the seller adds: the logo artwork is still being finalized. Go back to your brief and find the fields this affects. What needs adding to the logo and attachment version? What's still missing from the start condition for production time? Then look back at what you already knew in round one: three hundred units is only an inquiry quantity, and the actual purchase still needs approval. Those conditions stay. Adding one new fact doesn't change the fact that they're still waiting for approval. Now pause again. Keep the first version, and save a separate revised version. Write down which fields you changed and why. What I want you to practice is this: when new information comes in, update the parts it affects, and keep the conditions that still hold. When you're done, here's a very practical self-check. Find someone who wasn't involved, and give them only your brief and where the records are. Can they tell what's being quoted, which conditions are still open, and what reply would mean it's time to come back and review? If you have to stand next to them and explain a lot, go back and fix those fields. Quantity, timing, costs and authority especially need to be in the document. Leaving them in your memory isn't reliable. Today you finished two things. You wrote a one-page purchasing brief, and you used the five-question checklist to turn gaps in quotes into specific follow-up questions. In the next lesson, we'll take phrases like "good quality" and "smooth zipper" and turn them into product requirements you can check. And in lesson nine, we'll put the complete quotes into the cost model and work it through again.